Why Ottawa Restaurant Lots Ice Over Between Services
Ottawa restaurants get hit twice by the same weather. The morning storm covers the lot, then afternoon sun and the heat coming off the building melt what is left into a film that refreezes the moment the temperature drops for the dinner rush. February is the worst of it: the 2010-2019 monthly average puts 47 cm down that month against 39 cm in January, and February also averages 14.2 days with 20 cm or more already lying, so there is meltwater available on the lot nearly every day. Add freezing rain and a full dining room empties in twenty minutes while your walkway turns to glass. City crews are on a different clock entirely. A residential street is not plowed until 7 cm has fallen, and the standard then allows 10 to 16 hours, which is no help at all to a restaurant that opens at eleven.