Why Vars Laneway Snow Plowing Starts With the Surface
A gravel laneway is a different machine set-up from a paved driveway, and getting it wrong costs the owner in the spring rather than in January. Scrape a gravel lane to the stone and the top course ends up in the snowbank, so by breakup the lane is rutted and the shoulders are full of imported gravel. On Vars properties we leave a base layer, set the blade for the surface, and let that base firm up rather than fighting it every pass. The second half of the scope is what the snow hides. Long lanes running between open fields have ditch edges, culvert ends, a well head and a septic bed somewhere along them, and by February none of it is visible. The markers go in while the ground still is.