Why a Greely Laneway Needs a Second Pass After the Storm
In a tight suburb, the storm ends and the job is finished. In Greely it often is not. The estate lots sit with open ground on at least one side, so the wind that arrives behind a system picks snow up off the fields along the Bank Street and Mitch Owens Road corridor and lays it back across the laneway in a drift that is harder and denser than anything that fell out of the sky. A property cleared at dawn can be shut by mid-morning. That is why Greely work is planned as clearing plus a return for drift rather than one visit per storm, why exposed sections get cut wide so the drift has somewhere to land other than the running surface, and why capacity is held back for the route instead of being spent on the first call of the day.